Home    Industrial    Transformer Rectification

Transformer Rectification

Location: 1 Museum Drive, South Penrith
Duration: 2 weeks

S&A were contracted to mange the sandblasting and repainting of two transformers at their Penrith site. They selected S&A as a preferred contractor after the successful completion of the removal, rust treatment and repainting of the two large units.

The project involved our chemists to have onsite inspections to formulate the right specification of spraying, application methods and products required.

The project was successfully completed within two weeks by three S&A paint specialists and our Senior Project Manager supervising the project from start to finish.

Paints

  • Dulux Luxathane R
  • Rustblock Cold Gal
  • Omega Epoxy Primer 199

Services

  • Two Pack Polyurethane System
  • Roller Application
  • Spray Application
  • Micron Thickness Tests
  • Safety Project Management

Want to know more …?

Feel free to    Contact Us
or requst for a    Free Quote
  • Lahey Construction
  • ipmg_logo
  • roads maritime
  • National Facility Management
  • Transfield Servies
  • CBRE_logo_white_BG
  • william clarke college
  • cushman
  • hogs-hospitality-2
  • caltex
  • macdonalds
  • modous
  • st andews cathedral
  • pic1
  • pic2
  • pic3
  • pic4
  • pic17
  • pic6
  • pic16
  • pic5
  • pic7
  • pic8
  • pic18
  • pic9
  • pic15
  • pic10
  • pic11
  • pic12
  • pic14
  • pic13